Columbia Basin Performance Measures

Forecasted Juvenile Passage Exposure Results for Jul 10, 2016

graph

Forecasted Steelhead Snake R Wild Query Parameters
Year2016
ProjectJohn Day
River ParameterTemperature
Critical Temperature Value15 C
Calculate ExposureAbove Critical Value
River Parameter Data FillNo
Query Dates1/1 - 12/31
Forecast DateJul 10, 2016
Total Run Period (Mar 22 - Jul 25)
Temperature Exposure Index13.28 C
Percent of Fish Exposed5.9 %
Number of Days Fish Exposed35
Middle 80% of Run Period (Apr 24 - May 26)
Temperature Exposure Index13.18 C
Percent of Fish Exposed0 %
Number of Days Fish Exposed0
Middle 50% of Run Period (Apr 26 - May 18)
Temperature Exposure Index13.08 C
Percent of Fish Exposed0 %
Number of Days Fish Exposed0
Run Dates
First Day of RunMar 22
5% of Run passedApr 22
10% of Run passedApr 24
50% of Run passedMay 6
90% of Run passedMay 26
95% of Run passedMay 30
Last Day of RunJul 25
Date(s) When Temperature Crosses 15 C
May 30

1. Total Run Analyzed [99.955] is less than total observed during the period [100]. Only fish observed on days with River Parameter data are analyzed.