PIT-Tagged Wild Spring/Summer Chinook Query Parameters | |
Year | 2016 |
Project | Lower Granite |
River Parameter | Temperature |
Critical Temperature Value | 15 C |
Calculate Exposure | Above Critical Value |
River Parameter Data Fill | No |
Query Dates | 1/1 - 12/31 |
Total Run Period (Mar 22 - Aug 9) | |
Total Number of Fish Observed | 12905 |
Percent of Total Run Analyzed [Number Observed] | 100 % [12905] |
Temperature Exposure Index | 10.81 C |
Percent of Fish Exposed [Number Exposed] | 1.5 % [199] |
Number of Days Fish Exposed | 43 |
Middle 80% of Run Period (Apr 12 - May 13) | |
Number of Fish Observed | 10484 |
Percent of Middle 80% of Run Analyzed [Number Observed] | 100 % [10484] |
Temperature Exposure Index | 10.68 C |
Percent of Fish Exposed [Number Exposed] | 0 % [0] |
Number of Days Fish Exposed | 0 |
Middle 50% of Run Period (Apr 14 - May 7) | |
Number of Fish Observed | 7211 |
Percent of Middle 50% of Run Analyzed [Number Observed] | 100 % [7211] |
Temperature Exposure Index | 10.34 C |
Percent of Fish Exposed [Number Exposed] | 0 % [0] |
Number of Days Fish Exposed | 0 |
Run Dates | |
First Day of Run | Mar 22 |
5% of Run passed | Apr 10 |
10% of Run passed | Apr 12 |
50% of Run passed | Apr 24 |
90% of Run passed | May 13 |
95% of Run passed | May 20 |
Last Day of Run | Aug 9 |
Date(s) When Temperature Crosses 15 C | |
Jun 2 |