Adult Chinook Query Parameters | |
Year | 2017 |
Project | Bonneville |
River Parameter | Temperature |
Critical Temperature Value | 15 C |
Calculate Exposure | Above Critical Value |
River Parameter Data Fill | No |
Query Dates | 3/15 - 6/15 |
Total Run Period (Mar 15 - Jun 15) | |
Total Number of Fish Observed | 107516 |
Percent of Total Run Analyzed [Number Observed] | 100 % [107516] |
Temperature Exposure Index | 13.05 C |
Percent of Fish Exposed [Number Exposed] | 5.8 % [6250] |
Number of Days Fish Exposed | 4 |
Middle 80% of Run Period (May 5 - Jun 9) | |
Number of Fish Observed | 88684 |
Percent of Middle 80% of Run Analyzed [Number Observed] | 100 % [88684] |
Temperature Exposure Index | 13.11 C |
Percent of Fish Exposed [Number Exposed] | 7 % [6250] |
Number of Days Fish Exposed | 4 |
Middle 50% of Run Period (May 11 - May 30) | |
Number of Fish Observed | 56108 |
Percent of Middle 50% of Run Analyzed [Number Observed] | 100 % [56108] |
Temperature Exposure Index | 13.01 C |
Percent of Fish Exposed [Number Exposed] | 0 % [0] |
Number of Days Fish Exposed | 0 |
Run Dates | |
First Day of Run | Mar 15 |
5% of Run passed | May 4 |
10% of Run passed | May 5 |
50% of Run passed | May 22 |
90% of Run passed | Jun 9 |
95% of Run passed | Jun 12 |
Last Day of Run | Jun 15 |
Date(s) When Temperature Crosses 15 C | |
Jun 2, Jun 4, Jun 7, Jun 9 |