Columbia Basin Performance Measures

PIT Tag Exposure Results

graph

PIT-Tagged Wild Summer Steelhead Query Parameters
Year2018
ProjectMcNary
River ParameterTailrace TDG Percent
Critical Tailrace TDG Percent Value120 %
Calculate ExposureAbove Critical Value
River Parameter Data FillNo
Query Dates1/1 - 12/31
Total Run Period (Mar 26 - Jun 25)
Total Number of Fish Observed1581
Percent of Total Run Analyzed [Number Observed]100 % [1581]
Tailrace TDG Percent Exposure Index122.98 %
Percent of Fish Exposed [Number Exposed]55.9 % [885]
Number of Days Fish Exposed33
Middle 80% of Run Period (Apr 25 - May 29)
Number of Fish Observed1267
Percent of Middle 80% of Run Analyzed [Number Observed]100 % [1267]
Tailrace TDG Percent Exposure Index124.17 %
Percent of Fish Exposed [Number Exposed]61.9 % [785]
Number of Days Fish Exposed25
Middle 50% of Run Period (May 2 - May 19)
Number of Fish Observed840
Percent of Middle 50% of Run Analyzed [Number Observed]100 % [840]
Tailrace TDG Percent Exposure Index123.89 %
Percent of Fish Exposed [Number Exposed]66.5 % [559]
Number of Days Fish Exposed14
Run Dates
First Day of RunMar 26
5% of Run passedApr 15
10% of Run passedApr 25
50% of Run passedMay 8
90% of Run passedMay 29
95% of Run passedJun 4
Last Day of RunJun 25
Date(s) When Tailrace TDG Percent Crosses 120 %
Apr 25, Apr 26, May 6, Jun 7