Adult Chinook Query Parameters | |
Year | 2019 |
Project | The Dalles |
River Parameter | Temperature |
Critical Temperature Value | 15 C |
Calculate Exposure | Above Critical Value |
River Parameter Data Fill | No |
Query Dates | 3/15 - 6/15 |
Total Run Period (Apr 2 - Jun 15) | |
Total Number of Fish Observed | 49837 |
Percent of Total Run Analyzed [Number Observed] | 100 % [49837] |
Temperature Exposure Index | 13.8 C |
Percent of Fish Exposed [Number Exposed] | 26.9 % [13444] |
Number of Days Fish Exposed | 14 |
Middle 80% of Run Period (May 5 - Jun 11) | |
Number of Fish Observed | 40459 |
Percent of Middle 80% of Run Analyzed [Number Observed] | 100 % [40459] |
Temperature Exposure Index | 13.67 C |
Percent of Fish Exposed [Number Exposed] | 21.1 % [8551] |
Number of Days Fish Exposed | 10 |
Middle 50% of Run Period (May 9 - Jun 3) | |
Number of Fish Observed | 25814 |
Percent of Middle 50% of Run Analyzed [Number Observed] | 100 % [25814] |
Temperature Exposure Index | 13.51 C |
Percent of Fish Exposed [Number Exposed] | 6.2 % [1615] |
Number of Days Fish Exposed | 2 |
Run Dates | |
First Day of Run | Apr 2 |
5% of Run passed | May 3 |
10% of Run passed | May 5 |
50% of Run passed | May 16 |
90% of Run passed | Jun 11 |
95% of Run passed | Jun 14 |
Last Day of Run | Jun 15 |
Date(s) When Temperature Crosses 15 C | |
Jun 2 |