Publications and Papers

Found 54 results
Filters: Author is John R Skalski  [Clear All Filters]
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z 
E
Perry R, Skalski JR. Effects of Array Configuration on Statistical Independence of Replicated Telemetry Arrays used in Smolt Survival Studies. Design and Analysis of Salmonid Tagging Studies in the Columbia Basin [Internet]. 2008 ;XXIII. Available from: sites/default/files/papers/Skalski/D&A Volume 23 (Independence of Replicated Arrays).pdf
Skalski JR, Mathur D, Heisey PG. Effects of Turbine Operating Efficiency on Smolt Passage Survival. North American Journal of Fisheries Management [Internet]. 2002 ;22:1193-1200. Available from: http://dx.doi.org/10.1577/1548-8675(2002)022<1193:EOTOEO>2.0.CO;2
Buchanan RA, Skalski JR, Smith SG. Estimating the Effects of Smolt Transportation from Different Vantage Points and Management Perspectives. North American Journal of Fisheries Management [Internet]. 2006 ;26:460-472. Available from: http://dx.doi.org/10.1577/M05-080.1
Lady JM, Skalski JR. Estimators of stream residence time of Pacific salmon (Oncorhynchus spp.) based on release-recapture data. Canadian Journal of Fisheries and Aquatic Sciences [Internet]. 1998 ;55:2580-2587. Available from: http://dx.doi.org/10.1139/f98-132
Buchanan RA, Skalski JR, Giorgi AE. Evaluating Surrogacy of Hatchery Releases for the Performance of Wild Yearling Chinook Salmon from the Snake River Basin. North American Journal of Fisheries Management [Internet]. 2010 ;30:1258–1269. Available from: http://dx.doi.org/10.1577/M09-175.1
Perry R, Skalski JR. Evaluating Wetland Restoration Projects in the Columbia River Estuary using Hydroacoustic Telemetry Arrays to Estimate Movement, Survival, and Residence Times of Juvenile Salmonids. Design and Analysis of Salmonid Tagging Studies in the Columbia Basin [Internet]. 2008 ;XXII. Available from: http://pisces.bpa.gov/release/documents/documentviewer.aspx?doc=P107849
Skalski JR. Evaluation and Recommendations on Alternative Hydroacoustic Array Deployments for the Mouth of the Columbia River to Provide Estimates of Salmonid Smolt Survival and Movements. Design and Analysis of Salmonid Tagging Studies in the Columbia Basin [Internet]. 2006 ;XX. Available from: http://pisces.bpa.gov/release/documents/documentviewer.aspx?doc=00025091-1
Townsend RL, Skalski JR, Yasuda D. Evaluation of the 1995 Predictions of the Run-Timing of Wild Migrant Subyearling Fall Chinook in the Snake River Basin using Program RealTime. Monitoring and Evaluation of Smolt Migration in the Columbia Basin [Internet]. 1996 ;I. Available from: http://pisces.bpa.gov/release/documents/documentviewer.aspx?doc=35885-12
Townsend RL, Westhagen P, Yasuda D, Skalski JR, Ryding KE. Evaluation of the 1995 Predictions of the Run-Timing of Wild Migrant Yearling Chinook in the Snake River Basin using Program RealTime. [Internet]. 1996 . Available from: http://pisces.bpa.gov/release/documents/documentviewer.aspx?doc=35885-9
Townsend RL, Skalski JR, Yasuda D. Evaluation of the 1996 Predictions of the Run-Timing of Wild Migrant Subyearling Chinook in the Snake River Basin using Program RealTime. Monitoring and Evaluation of Smolt Migration in the Columbia Basin [Internet]. 1997 ;II. Available from: http://pisces.bpa.gov/release/documents/documentviewer.aspx?doc=91572-2
Townsend RL, Skalski JR, Yasuda D. Evaluation of the 1996 Predictions of the Run-Timing of Wild Migrant Spring/Summer Yearling Chinook in the Snake River Basin using Program RealTime. [Internet]. 1997 . Available from: http://pisces.bpa.gov/release/documents/documentviewer.aspx?doc=91572-1
Townsend RL, Skalski JR, Yasuda D. Evaluation of the 1997 predictions of run-timing of wild migrant yearling and subyearling chinook and sockeye in the Snake River Basin using program RealTime. Monitoring and Evaluation of Smolt Migration in the Columbia Basin [Internet]. 1999 ;III. Available from: http://pisces.bpa.gov/release/documents/documentviewer.aspx?doc=91572-6
Burgess C, Townsend RL, Skalski JR. Evaluation of the 1998 Predictions of the Run-Timing of Wild Migrant Yearling and Subyearling Chinook and Steelhead, and Hatchery Sockeye in the Snake River Basin using Program RealTime. Monitoring and Evaluation of Smolt Migration in the Columbia Basin [Internet]. 1999 ;IV. Available from: http://pisces.bpa.gov/release/documents/documentviewer.aspx?doc=91572-7
Burgess C, Skalski JR. Evaluation of the 1999 Predictions of the Run-Timing of Wild Migrant Yearling and Subyearling Chinook Salmon & Steelhead Trout, & Hatchery Sockeye Salmon in the Snake River Basin using Program RealTime. Monitoring and Evaluation of Smolt Migration in the Columbia Basin [Internet]. 2000 ;V. Available from: http://pisces.bpa.gov/release/documents/documentviewer.aspx?doc=91572-4
Burgess C, Skalski JR. Evaluation of the 2000 Predictions of the Run-Timing of Wild Migrant Chinook Salmon & Steelhead Trout, & Hatchery Sockeye Salmon in the Snake River Basin, & Combined Wild & Hatchery Salmonids migrating to Rock Island & McNary Dams Using Program RealTime. Monitoring and Evaluation of Smolt Migration in the Columbia Basin [Internet]. 2001 ;VI. Available from: http://pisces.bpa.gov/release/documents/documentviewer.aspx?doc=91572-5
Burgess C, Skalski JR. Evaluation of the 2001 Predictions of the Run-Timing of Wild and Hatchery-Reared Migrant Salmon and Steelhead Trout migrating to Lower Granite, Rock Island, McNary, and John Day Dams using Program RealTime. Monitoring and Evaluation of Smolt Migration in the Columbia Basin [Internet]. 2001 ;IX. Available from: http://pisces.bpa.gov/release/documents/documentviewer.aspx?doc=00004134-1
Burgess C, Skalski JR. Evaluation of the 2002 Predictions of the Run-Timing of Wild and Hatchery-Reared Salmon and Steelhead Smolt to Lower Granite, Rock Island, McNary, and John Day Dams using Program RealTime. Monitoring and Evaluation of Smolt Migration in the Columbia Basin [Internet]. 2002 ;X. Available from: sites/default/files/papers/Skalski/ser2vol10FINAL.pdf
Burgess C, Skalski JR. Evaluation of the 2003 Predictions of the Run-Timing of Wild and Hatchery-Reared Migrant Salmon and Steelhead Trout migrating to Lower Granite, Rock Island, McNary, and John Day Dams using Program RealTime. Monitoring and Evaluation of Smolt Migration in the Columbia Basin [Internet]. 2003 ;XI. Available from: http://pisces.bpa.gov/release/documents/documentviewer.aspx?doc=00004134-6
Griswold J, Townsend RL, Skalski JR. Evaluation of the 2004 Predictions of the Run-Timing of Wild and Hatchery-Reared Migrant Salmon and Steelhead Trout migrating to Lower Granite, Rock Island, McNary, John Day, and Bonneville Dams using Program RealTime. Monitoring and Evaluation of Smolt Migration in the Columbia Basin [Internet]. 2005 ;XII. Available from: http://pisces.bpa.gov/release/documents/documentviewer.aspx?doc=00013690-4
Griswold J, Townsend RL, Skalski JR. Evaluation of the 2005 Predictions of the Run-Timing of Wild and Hatchery-Reared Migrant Salmon and Steelhead Trout migrating to Lower Granite, Rock Island, McNary, John Day, and Bonneville Dams using Program RealTime. Monitoring and Evaluation of Smolt Migration in the Columbia Basin [Internet]. 2006 ;XIII. Available from: http://pisces.bpa.gov/release/documents/documentviewer.aspx?doc=00013690-5
Townsend RL, Westhagen P, Skalski JR. Evaluation of the 2006 Predictions of the Run-Timing of Wild and Hatchery-Reared Salmon and Steelhead Smolt at Rock Island, Lower Granite, McNary, John Day and Bonneville Dams using Program Real Time. Monitoring and Evaluation of Smolt Migration in the Columbia Basin [Internet]. 2007 ;XIV. Available from: http://pisces.bpa.gov/release/documents/documentviewer.aspx?doc=00025093-2
Townsend RL, Westhagen P, Skalski JR. Evaluation of the 2008 Predictions of the Run-Timing of Wild and Hatchery-Reared Salmon and Steelhead Smolts to Rock Island, Lower Granite, McNary, John Day, and Bonneville Dams using Program RealTime. [Internet]. 2008 . Available from: sites/default/files/papers/Skalski/M&E Volume XVII (2008 RealTime Report).pdf
Townsend RL, Westhagen P, Skalski JR. Evaluation of the 2009 Predictions of the Run-Timing of Wild and Hatchery-Reared Migrant Salmon and Steelhead Smolts to Rock Island, Lower Granite, McNary, John Day, and Bonneville Dams using Program RealTime. Monitoring and Evaluation of Smolt Migration in the Columbia Basin [Internet]. 2010 ;XIX. Available from: http://pisces.bpa.gov/release/documents/documentviewer.aspx?doc=P115115
Townsend RL, Westhagen P, Skalski JR. Evaluation of the 2010 Predictions of the Run-Timing of Wild and Hatchery-Reared Salmon and Steelhead Smolts to Rock Island, Lower Granite, McNary, John Day, and Bonneville Dams using Program RealTime. [Internet]. 2011 . Available from: sites/default/files/papers/Skalski/M&E Volume XX (2010 RealTime Report).pdf
Townsend RL, Westhagen P, Skalski JR. Evaluation of the 2011 Predictions of the Run-Timing of Wild and Hatchery-Reared Salmon and Steelhead Smolts to Rock Island, Lower Granite, McNary, John Day, and Bonneville Dams using Program RealTime. [Internet]. 2011 . Available from: sites/default/files/papers/Skalski/M&E Volume XXI (2011 RealTime Report).pdf
Skalski JR, Ngouenet RF. Evaluation of the compliance testing framework for RPA improvement as stated in the 2000 Federal Columbia River Power System (FCRPS) Biological Opinion. Monitoring and Evaluation of Smolt Migration in the Columbia Basin [Internet]. 2001 ;VII. Available from: http://pisces.bpa.gov/release/documents/documentviewer.aspx?doc=00004134-2